Compliance Glossary for Confluence

What evidence should a release preserve?

A release package should preserve the exact evidence used for that release. Compliance Glossary freezes approved meanings, scanned Confluence page revisions with SHA-256 hashes, usages, findings, and coverage. Uploaded files join the current freeze. Code and tests appear only as declared trace nodes. The app captures no code revisions and executes no signatures.

Last verified against production v6 · 24 October 2026

Watch: Freeze, Sign and Prove an Approved Document Package in Confluence (DORA Example)

The embedded player uses YouTube’s privacy-enhanced domain. You can also watch the video on YouTube.

Transcript

Release day. The auditor asks one simple question: what exactly did you approve? Which definitions, which documents, which versions? In most teams, answering that takes days of digging through pages and spreadsheets. In Compliance Glossary, you pick the spaces, write a reason, and create a terminology baseline. The app freezes every approved term with its meaning at that moment, together with every scanned page and its version. Now the accountable people sign it. Each sign-off records who signed, in which role, and when, bound to a fingerprint of the frozen content. For the auditor or your archive, download the baseline package as JSON or CSV: terms, meanings, pages, versions and sign-offs in one file. Six months later, the question has a one-click answer. Compliance Glossary for Confluence.

At a glance

InputActionOutputLimit
Approved terms and governed spacesCreate enterprise freezeFixed meanings and scanned page revisions with SHA-256Incomplete coverage remains visible under Coverage blockers
Supported files such as PDF, DOCX, or XLSXUpload controlled evidenceFile evidence in the current enterprise freezeSupported types and a 25 MiB maximum apply
Code and testsDeclare trace node with an external referenceA candidate node that a second administrator reviewsNo code revision, test result, or hash is captured
Approved trace linksReview them in Trace graphForward impact and Reverse provenance pathsLinks are reviewed records, not frozen into the enterprise freeze. Candidate links do not count.
Terminology baselineCreate baseline, then Sign this baselineRole sign-offs and Download baseline package (JSON) or (CSV)A sign-off is not a qualified electronic signature
External approval referenceDeclare trace node of type approval_evidenceRecorded reference to the external approvalApproval and signatures occur externally

How it works

  1. Complete terminology review and the required scans.
  2. In Terminology Baseline, enter the Reason for this baseline, choose Spaces included, and select Create baseline.
  3. Collect role sign-offs with Sign this baseline.
  4. Download the package with Download baseline package (JSON) or Download baseline package (CSV).
  5. In Enterprise evidence workspace, use Create enterprise freeze and Prepare and queue freeze for the governed spaces.
  6. Resolve Coverage blockers, then select Run verification.
  7. Choose a Start node, select Show trace graph, and review Forward impact and Reverse provenance.

Example

A release changes a regulated term and the code that implements it. The freeze preserves the prior approved meaning, affected page revisions, and findings. Approved trace links connect the term to its requirement. The code change appears as a declared code reference node pointing to the repository. The repository and the external quality system retain the code revision, approval, and signature evidence.

What this does not mean

Compliance Glossary prepares and preserves supporting evidence. It does not capture source code, test runs, or code revision hashes. It does not decide release readiness, certify compliance, approve the release, or execute signatures. The organization owns the release decision and qualified approval system.

Related questions

Next step

Define the required release evidence before freezing the package. Keep code and test evidence in the systems that produce it.

View on Atlassian Marketplace
Verification basis: production v6 code, tests, manifest, and operations guidance. Verified 24 October 2026.